Tips for Vertical Up Stick Welding Using E6010 & E6011

Stick welding can be a challenge for novice welders because of the constant need for adjustment caused by the  shortening of the electrode as it is consumed.  Go out of position and all hell may break loose.  For those of us that are experienced welders a 3F or 3G vertical up with SMAW can still be challenging.  E6010 and E6011 electrodes add yet another challenge, compared to E7018, due to the harshness of the arc and whip technique employed.  Below are a few tips on how to make your vertical up welds less challenging.

The slag system on stick electrodes allow for great out-of-position welding.

The slag system on stick electrodes allow for great out-of-position welding.

A quick note: the main difference between an E6010 and an E6011 is that the E6010 is designed specifically for DC+ current while the E6011 will run “well” on AC.  Unless you are stuck with an AC-only welder use E6010.  There is caveat to this recommendation: If you are experiencing arc blow toward the end of the weld AC current will alleviate this problem.

Are you looking for welding procedures for E6010 and/or E7018 stick processes?  Click the image above to get 48 Prequalified WPSs for SMAW in conformance with AWS D1.1 Structural Welding Code.

Are you looking for welding procedures for E6010 and/or E7018 stick processes? Click the image above to get 48 Prequalified WPSs for SMAW in conformance with AWS D1.1 Structural Welding Code.

The current you need depends on the size of rod you are using.  Follow the manufacturer’s procedure recommendations.  For a 1/8 6010 or 6011 use 80-90 amps.  We prefer close to 90 to get a flatter bead. Don’t increase your current too much due to the potential for undercut. Also, higher currents will lead to more spatter.

Technique:

Use a whipping technique in the first past.  No weaving.  The first pass will tend to be a bit ropey. Increase your current if necessary, but don’t worry if it’s not perfectly flat.  You can fix this by running a weave in the second and third passes.  A box weave will flatten the weld in the second pass because you will dwell longer at the sides, thus filling the toes nicely.  The last pass can be a straight weave.

 

Recommended techniques for a multiple-pass 3F Vertical Up weldment.

Recommended techniques for a multiple-pass 3F Vertical Up weldment.

Keep in mind that although it is common practice to whip a 6010 or 6011 you don’t always have to do this.  Some welders will run the inverted “T” weave.  This combines whip action with a straight weave.  The purpose of whipping is to allow the puddle to cool and solidify quickly.

IMPORTANT SIDE NOTE: Never whip an E7018 – you will introduce hydrogen into the weld.

Other tips:

  • Always get comfortable before starting your weld. Experienced welders can free-hand this type of weld, but when available they will brace themselves. This can be as easy as leaning on a table, fixture or the part itself.
  • In short welds, or if you are preparing to run your 3F or 3G test, do a dry run. Run up and down the joint (without arcing) and make sure you can go the entire length without drastically changing your work and travel angles.
  • If the power source has an arc force feature use it to your advantage. This feature will increase energy to the arc and prevent sticking.  It also allows you to drive the stick into a the joint without losing your arc.  This is great on open root pipe.  The higher the setting the more forceful the arc will be.

 

If you have any other tips please share on the comments section.

Please note: I reserve the right to delete comments that are offensive or off-topic.

Leave a Reply to Lucilla Moriconi Cancel reply

Your email address will not be published. Required fields are marked *

9 thoughts on “Tips for Vertical Up Stick Welding Using E6010 & E6011

  1. First of all, only welders with recent qualifications specifically relating to the use of cellulosic electrodes should be allowed to carry out any welding activity with them. A preheat identical to the one required for rutile electrodes should be applied before welding to reduce the cooling rate of the weld and allow for hydrogen release.

  2. Curious question. I know for uphill vertical 6010, you’re supposed to use weave, or upside down t, but can you use a regular whip and pause motion?

    • Yes you can. The whip allows the puddle time to cool. 6010 is a very harsh, digging electrode. Whipping prevents it from digging to deep and blowing through. It is recommended that you do this on the root pass of a multiple pass weld. If welding a T-joint vertical up whip (straight) the first pass and then weave the next passes.

  3. I understand this article is a little old. However, I’ve been stuck on vert up for almost a month now, my instructor is requiring us to learn to perform a 6 pass fillet weld with only 5+p 6010. I’m having a heck of a time trying to get it right. My first 3 passes tend to be decent, but my 4-6 pass just turn into hammered dog poop. Any advice?

    • Chris, are you failing a destructive test or is it based just on bead appearance? The root pass and the next layer (whether it is done in one or two passes) are held nicely by the walls. As you go up you only have one side wall to use so the puddle will run a bit more. Try reducing your amperage for passes 4-6. Whipping the electrode cools the puddle and makes it solidify quicker. If you are not doing this give it a try as well.

    • With a 7018 you have to keep a very short arc length. A long arc will introduce hydrogen to the weld which will decrease weld strength and increase susceptibility to cracking. Straight weave and box weave are OK as long as you keep that arc length tight. If you have the arc control feature on your machine (some manufacturers call it “dig”) you will want to set it on the lower half.